Sheet A-400 / process
Process
Six steps. You sign twice: once to agree what "done" means, once to confirm it happened.
- Step 2: scope + acceptance checks
- you sign
- Step 5: checks passed
- you sign
- Every change in between
- ticket + approval
-
01
Scope call
30 minutes
You tell us what you run, what worries you and when your maintenance windows are. We ask for the one export that matters: RVTools for VMware, repo list for Claude Code, node list for Care Plans.
You getA straight answer on fit, and a price range.
-
02
Written scope + acceptance checks
2-3 business days
A short document: what we will do, what we will not, the fixed price, the windows, the rollback plan, and a numbered list of acceptance checks. Each check says how it will be proved.
You signThe scope and the check list. Nothing starts before this.
-
03
Lab rehearsal
1-2 weeks
We rebuild the relevant part of your setup on our own hardware and run the job end to end. We time it, break it, roll it back and fix the runbook until two runs in a row are clean.
You getA rehearsal report with measured timings and what went wrong.
-
04
Change window
your schedule
Inside your window, through your tools. The protocol below runs every time, whatever the size of the change.
You seeA live log or a call, your choice.
-
05
Delivery + acceptance checks
same window or next day
We run the signed check list with you, one item at a time. If a check fails, we fix it or roll back. We do not argue about it.
You signThat the checks passed.
-
06
Handover
within 5 business days
Runbook, short screen-recorded video, our access removed while you watch, then 30 days of hypercare for anything the change caused. After that, an optional Care Plan.
You keepRunbook, video, reports, and the only remaining admin accounts.
Change window protocol
Printed into every scope. If any line cannot be met, the window is postponed.
- Ticket open, approval recorded. No ticket, no change.
- Backup or snapshot taken and verified. We read back the job result before touching anything.
- Access opened for the window only. MFA, named account, through your VPN, RMM or PAM.
- Runbook from the rehearsal followed step by step. Deviations are written into the ticket as they happen.
- Rollback point declared in advance. If we pass the agreed time without a working system, we roll back.
- Access closed at the end of the window. Confirmed in the ticket.
Who stands behind the work
Backed by our sister company Serverwale (serverwale.com), which has run enterprise servers across India for 10 years: from single servers to data-centre racks, hundreds of machines under management.
Every deliverable is rehearsed in our lab and checked before handover. Nothing reaches your systems without passing the same rehearsal and acceptance checks.
Your data stays inside the scope you agree in writing. For Private AI jobs, it never leaves your hardware.
Step one takes thirty minutes
Bring a rough idea of what you run. We bring questions.